Helping You Connect the Dots to Succeed Faster
WGAN-TV: Now Playing
WGAN-TV: Now Playing
Free WGAN Map
Locations of Matterport Pro3 Camera Service Providers and see the number of Matterport Pro3s and/or BLK360s for each Matterport Pro.
View WGAN Map
Contact Info
Locations of Matterport Pro3 Camera Service Providers and see name, company, website, email and mobile phone for each Matterport Pro.
Join WGAN Sponsor
Get on the Map | A Service of We Get Around Network (not affiliated with Matterport)
One Order  |  One Quote  |  One Contact
Book Multiple GLOBAL Commercial Locations
  • ✔  As-Builts
  • ✔  Construction Progress
  • ✔  Facilities Management
Last 24 Hours: 222 Unique Visitors
9,265 WGAN Members in 149 Countries
Last 30 Days: 22,910 Page Views | 11,965 Unique Visitors | 24 New Members
We Get Around Network Forum
Quick Start | WGAN Forum
How ToPro2Question of the DayScanningSchools

Best way to film space with 4 floors that only connect on ground level?14096

Virtour private msg quote post Address this user
Our team is filming a school that has 2 wings - East and West.
The ground-level floor of the school spans the width of both wings.
The East Wing has 3 floors above ground level and those are only accessible by staircase A.
The West Wing has 2 floors above ground level and those are only accessible by staircase B.

The concern is that the spaces will not align if they can't be connected on the second and third levels between the two wings. Any suggestions/best practices to get this all populated in one Matterport model?

Thanks in advance,
Noah
Post 1 IP   flag post
WGAN
Standard
Member
Los Angeles
Home3D private msg quote post Address this user
Just very generic advice here. Scan the along the routes you have, but throughout all doorways and stairwells keep an eagle eye on the mini-map as each new scan aligns. If any NEW wall data appears which is out of the 90° alignment (presuming it's a typical building in this way) then delete the scan immediately and try again. Also, if ANY scan on these connecting pathways give you a "Low Scan Overlap" (I think that's the name), DELETE, do not accept, the scan. Then reduce the distance from previous and try again until you don't get this warning. That's the best key to making sure everything stays at proper 90° angles, or close enough that the Matterport processing algorithm will straighten it out.
Post 2 IP   flag post
WGAN Fan
CLUB Member
Coeur d'Alene, Idaho
lilnitsch private msg quote post Address this user
Adding onto @Home3Ds advice

I'd also suggest scanning the entire main floor first then, tackle each wings upper floors.

So, in short Main floor first, then entire East Wing, then entire West Wing ~ doesn't matter which wing gets scanned first just do those upper floors in entirety before capturing the other wing
Post 3 IP   flag post
WGAN
Standard
Member
Cayman Islands
Harrycayman private msg quote post Address this user
i just did a school where i connected the ground floor buildings and then had second floor of each building just named it floor 3 and matterport put it in right floor for each separate building . But yes do not accept any low scan overlaps.
Post 4 IP   flag post
Virtour private msg quote post Address this user
Thank you @Home3D , @lilnitsch , and @Harrycayman !
Much appreciate the advice and insight - will keep you posted on how it turns out!
Post 5 IP   flag post
WGAN Forum
Founder &
WGAN-TV Podcast
Host
Atlanta, Georgia
DanSmigrod private msg quote post Address this user
@Virtour

Thanks for sharing the tour here, once done (plus, how you accomplished it).

Best,

Dan
Post 6 IP   flag post
104373 6 6
This topic is archived. Start new topic?