Helping You Connect the Dots to Succeed Faster
WGAN-TV: Now Playing
WGAN-TV: Now Playing
Get access to the We Get Around Network Map of Matterport Pro3 Service Providers – and permission to post Help Wanted ads in the We Get Around Network Forum.
Join WGAN Help Wanted Marketing Partner
MSP? Get on the WGAN Pro3 Map
A Service of We Get Around Network (not affiliated with Matterport).
One Order  |  One Quote  |  One Contact
Book Multiple GLOBAL Commercial Locations
  • ✔  As-Builts
  • ✔  Construction Progress
  • ✔  Facilities Management
Last 24 Hours: 246 Unique Visitors
9,354 WGAN Members in 149 Countries
Last 30 Days: 19,476 Page Views | 9,423 Unique Visitors | 13 New Members
We Get Around Network Forum
Quick Start | WGAN Forum
360AdviceBLK360Capture AppGearHow To

Scanning large space - advice for using BLK360 with Pro 211886

SpencerLasky private msg quote post Address this user
Dan if this needs to be moved apologies upfront.

This project I've asked about a few times - if I manage to make this work it should be a good reference for large domes, and mixed use cameras.

This is a bank building with a 90' dome, two floors under it, two stairways up and down each and an outside space.

Question - best pratice for doing BLK360 of the dome area and upper floor and seaming that to the M pro 2 of the smaller rooms, hallways, and floors below.

The best research tells me I can get the dome on the BLK360 because matterport will not drop a hexagonal blur on it in the cloud software engine. This told to me by tech support, also confirmed by finding examples. Also, confirm all matterport pro 2 scans have the blur, it's not the camera data it's the software engine putting it on - of course, because the stitch will fail on full tilt-up with this camera, and unless you have a 90'dome directly overhead it's probably never been a problem.

My pro 2 scan - top floor and lower floor (one more to go)
https://my.matterport.com/show/?m=uoZqTEnesUy
Note: the dome gets blurred on extreme tilt up.

Today's Test - Theta V - it gave me the dome but can not navigate out of the small rooms, the capture fell apart pretty fast in this big space.
https://my.matterport.com/show/?m=KkxRP8F8yLb


Matterprot supplied a sample of BLK360 - however, it uses BLK360 outside only and switches to pro 2 at the entrance to cave - look up to see when the hexagonal blur start. Outside no blur as you approach door is the handoff, the resolution gets better too.

https://my.matterport.com/show/?m=aRGwje8aXc3

Thank you for any help - I can not seem to get a matterport tech to save my life. Any ideas on that I'm all ears too.

Spencer
Post 1 IP   flag post
Garnetwest private msg quote post Address this user
Is that Gotham Hall...the old Greenwich Savings Bank building?
Post 2 IP   flag post
SpencerLasky private msg quote post Address this user
No it's Williamsburg bank - there were two in Brooklyn this is the one in Williamsburg - both are amazing!

Spencer
Post 3 IP   flag post
Garnetwest private msg quote post Address this user
Oh yes...i know that one as well. Amazing location. Good luck on the job!!
Post 4 IP   flag post
Belfast, United Kingdom
3dshowcaseuk private msg quote post Address this user
I scanned these yesterday. Processed overnight.

The perimeter of the warehouses were scanned with a pro 2 and the middle was approx 16 -20 spins of the BLK

You can see which are which by the ceiling blur

This was with HDR off and scan density medium

Lots of good advice here.

https://support.matterport.com/hc/en-us/articles/360000643507-Prepare-to-Scan-with-the-BLK360#blk360-setup-0-0

You will need extra batteries for BLK they run low very


quickly[matterport]https://my.matterport.com/work/?m=mvAVXwzWX4k[/matterport]

Post 5 IP   flag post
SpencerLasky private msg quote post Address this user
Ok thanks 3DShowCaseUk - that is exactly what I needed to confirm though I have gathered as much on some of the sample videos that matterport has. My remaining question to fix this is, do I use my existing scan and add BLK360 for the center as you have done and then remove the older matterport pro 2 scan's from the center? This sequence makes sense to me so the model does not lose its information but the viewer can see the BLK and lookup - the problem for client solved. Or.. alternatively I can just hide these scans? Leaving the entire project intact for the new processing but then in workshop hide the m pro 2 scans so again the view gets to see the domes.
Post 6 IP   flag post
Cincinnati, OH
leonherbert private msg quote post Address this user
@SpencerLasky I would just hide the pro 2 scans, can always use the better resolution for 2D photographs.
Post 7 IP   flag post
Cincinnati, OH
leonherbert private msg quote post Address this user
@SpencerLasky Cool project
Post 8 IP   flag post
105379 8 8