Helping You Connect the Dots to Succeed Faster
WGAN-TV: Now Playing
WGAN-TV: Now Playing
Free WGAN Map
Locations of Matterport Pro3 Camera Service Providers and see the number of Matterport Pro3s and/or BLK360s for each Matterport Pro.
View WGAN Map
Contact Info
Locations of Matterport Pro3 Camera Service Providers and see name, company, website, email and mobile phone for each Matterport Pro.
Join WGAN Sponsor
Get on the Map | A Service of We Get Around Network (not affiliated with Matterport)
One Order  |  One Quote  |  One Contact
Book Multiple GLOBAL Commercial Locations
  • ✔  As-Builts
  • ✔  Construction Progress
  • ✔  Facilities Management
Last 24 Hours: 148 Unique Visitors
9,265 WGAN Members in 149 Countries
Last 30 Days: 21,696 Page Views | 11,459 Unique Visitors | 24 New Members
We Get Around Network Forum
Quick Start | WGAN Forum
Tour of the WeekTrainTunnel

Tour of the Week>Grand Paris Express is the largest urban project in Europe10622

WGAN Forum
Founder &
WGAN-TV Podcast
Host
Atlanta, Georgia
DanSmigrod private msg quote post Address this user
Video: Time-lapse Tour of Grand Paris Express | Video courtesy of Société du Grand Paris YouTube Channel (11 July 2019)

Hi All,

The Matterport 3D tour of the Week is:

Grand Paris Express is the largest urban project in Europe [English Translation by Google]

[Look for three thumbnails to launch Matterport 3D Tour]

Project: Grand Paris Express
Client: Société du Grand Paris
Matterport 3D Tour by: inmaps
Location: Paris, France

I have reached out to WGAN Member Daniel, with inmaps, to post the story about their massive Matterport project in Paris, France.
Post 1 IP   flag post
DanielJ private msg quote post Address this user
Here is the backstory:

We are a french start-up https://inmaps.fr/ specialized in 3D interactive virtual tours for large companies.

With its 200 km of automatic lines, as much as the current french metro, and 68 stations: the Grand Paris Express is the largest urban project in Europe (more info here)
clickable text
Société du Grand Paris, in charge of the implementation of the Grand Paris Express, asked us to make the captures of their main projects, allowing everyone to discover the other side of the palisades of the construction site.

The first modeled construction site that Dan invited you to discover is a huge area with a part immersed in the tunnel boring machine and a part of it emerged on the construction site.
clickable text

The technical challenge for us was to capture the whole site for one day because it was the only opportunity to have an empty site and here is the secret recipe we use:
Ingredients:

- 1 camera Insta360 One X with an extensible boom to realize the video teaser
- 1 Matterport Pro2 3D Camera for underground capture
- 1 Leica BLK 360 camera for outdoor capture
- 1 iPad with Matterport Capture app
- 1 iPhone with Matterport capture application
- 2 people to capture

Preparation:

- We have identified with our client the entire visit and define the desired path that we have represent on a map and we made estimation with the distance of the number of points and the duration of each stage of the capture.

Capture:

Our strategy was to secure outdoor spaces and we started two models in parallel

- 1 person made the capture with the BLK 360 outside going down the stairs until the entrance of the TBM
- 1 other person start capturing the TBM with the Matterport Pro2 3D Camera

Once we have finish, we realized the video teaser on the whole course with the camera insta360 One X. As the tunnel measured 1 km we used a bike to browse it and then we worked it in the iPad application insta360

Post Production:

- In order to avoid the efforts of stairways we have to duplicate the outside model in 2 and keep a visit for the outside and a visit for the entrance of the tunnel boring machine and a last with the inside of the tunnel boring machine. We used different color tags to link the different visits.

- We then gave him the visit to position
- We sent our client before the capture a table allowing him to specify all the resources videos / photos / texts they wanted to appear in the visit

Feedback:

- The Société du Grand Paris was able to benefit from a wide promotion campaign through its site and the various social and media networks to achieve a real buzz around the tunnel boring machines and they were very satisfied with the impact obtained

- The technical evolution for the next sites capture: we found Leica BLK360's camera very slow for the recordings with ultimately a resolution that was not up to what we hope.

For the next outdoor sites we will rather use the Panono camera and the Cupix capture studio that I discovered through this fantastic We Get Around Network Forum and all the invaluable advices from Dan.
Post 2 IP   flag post
WGAN Forum
Founder &
WGAN-TV Podcast
Host
Atlanta, Georgia
DanSmigrod private msg quote post Address this user
@DanielJ

Much thanks for sharing the backstory on this amazing project with the WGAN Community.

Congratulations too! What a great project!

Happy holidays,

Dan
Post 3 IP   flag post
104377 3 3
This topic is archived. Start new topic?